The microgrid civil works/equipment installation phase involves constructing the physical infrastructure required to support the microgrid. This phase is essential for preparing the site and ensuring that all structures, foundations, and necessary civil works are completed to accommodate the microgrid’s electrical and mechanical components.

 

During this phase, Island Microgrids with partners support the Client. 

 

Below is a summary of what this phase typically involves and how it would be delivered

​

1. Civil Works Contract Management

Island Microgrids with its partners will be on hand to support the Client manage its contract with its nominated civil works contractor.

 

2. Civil Works Quality Assurance and Control

Island Microgrids with its partners will be on hand to support the Client manage its contract with its

nominated civil works contractor for

  • Material Specifications: Ensuring that all materials used meet the specified quality standards, including concrete, steel, aggregates, and other construction materials.

  • On-Site Inspections: Conducting regular on-site inspections to monitor construction quality and compliance with design specifications.

  • Testing: Performing necessary testing of materials and structures (e.g., concrete strength tests, soil compaction tests) to ensure compliance with standards.

 

3.  Equipment Mechanical and Electrical Installation Quality Assurance & Control

Island Microgrids with its partners will also be on hand to support the Client manage its contract

with its nominated civil works contractor for

  • Equipment Installation: Ensuring all major equipment, including generators, PV panels, batteries, inverters, and transformers in installed correctly.

  • Electrical Wiring and Cabling: Ensuring all electrical wiring and cabling are installed as per the design specifications.
     

4. Construction and Installation

Island Microgrids with its partners will be on hand to support the Client manage its contract with its nominated civil works contractor.​

  • Site Preparation: Clearing and preparing the site, including any necessary earthmoving, grading, and leveling.

  • Foundation Work: Constructing foundations according to the specified designs, ensuring they are capable of supporting the load and environmental conditions.

  • Building Construction: Erecting any required buildings or enclosures for housing equipment, control rooms, or other infrastructure.

  • Roads and Access: Constructing access roads and pathways to ensure safe and efficient transportation of materials and equipment during and after construction.

  • Utility Installation: Installing necessary utilities, such as water, sewage, and communication lines, to support the microgrid infrastructure.

  • Security Features: Installing fencing, gates, and security systems as specified to protect the microgrid components.

​

5. Environmental and Safety Compliance

Island Microgrids with its partners will be on-hand to support the Client deliver its Environmental & Safety Compliance at site with its nominated civil works contractor.

  • Environmental Mitigation: Implementing any environmental mitigation measures specified in the design phase, such as erosion control, dust suppression, and habitat protection.

  • Safety Management: Ensuring that all construction activities adhere to safety standards, including worker safety protocols, signage, and protective equipment.

 

6. Documentation and Reporting (Client / Island Microgrids)

  • Construction Documentation (Client): Maintaining detailed records of construction activities, including daily logs, inspection reports, and change orders.

  • As-Built Drawings (Island Microgrids): Preparing as-built drawings that reflect any changes made during construction.

  • Progress Reporting (Client): Providing regular updates to stakeholders on the progress of civil works, including any issues encountered and how they are being addressed.

 

The civil works / equipment installation phase is a critical step in preparing the site for the microgrid’s electrical and mechanical systems. Proper execution during this phase ensures a solid foundation and infrastructure, which is essential for the long-term success and reliability of the microgrid.

​​